A 2,000m2 warehousing facility for an international food packaging manufacturer. A successful project in every way, the building was delivered on time and on budget. Works involved Geo-Improvement, extensive building foundations, FM3 standard industrial floor slab, storm drainage attenuation system and fully insulated steel frame building envelope
A 2,500m2 warehousing extension for a multinational car parts manfacturer. Works included full design package, stormwater attenuation system, all building foundations, floor slab to FM3 standard, and fully insulated steel frame building envelope connected to existing structure
A repeat order project that presented many challenges. The site was very restricted and had to enable continued use of the adjacent building by our client. The project involved a full design package, extensive retaining wall and access ramp construction, building envelope, dock levellers with loading doors and internal rapid action roller door, despatch office construction and external traffic management system
An interesting project, fully converting an existing steel framed building into a high specification residence. The existing structure was successfully integrated into a highly efficient, modern dwelling. Works involved Thermal upgrades, structural alterations, complete new building envelope, first floor structure, low CO2 heating and electrical installations